Logistics & Delivery

Crated, sequenced, and on the floor it belongs to.

Finished millwork is fragile freight. Metro crates and blankets every assembly, sequences deliveries to the install schedule and floor stacking plan, and plans the path — dock, elevator, corridor — before the truck rolls.

What this stage covers

  • Protective crating and blanket-wrap in the shop
  • Deliveries sequenced by floor, phase and install order
  • Elevator, dock and path-of-travel planning with the GC
  • Climate acclimation windows respected before install
  • Staged storage solutions when site readiness slips

What you get

Millwork arriving in showroom condition, exactly when the schedule can absorb it.

Questions

What if the site is not ready?

We hold finished work in the shop or staged storage rather than exposing it to a wet building — and document readiness criteria with the GC in advance.